Lagos Blue Line
🚆 Light metro · Electric · CRRC · CCECC-built
Phase 2 to Okokomaiko targeting 2027.
Length
13 km open (27 full)
Stations
5 open (13)
Opened
2023
Footfall
~250k/day
metro.ad / Lagos
🇳🇬 Nigeria
5 transit systems in Lagos, with service running since 2008 — 3 operational and 2 under construction or planned.
🚆 Light metro · Electric · CRRC · CCECC-built
Phase 2 to Okokomaiko targeting 2027.
Length
13 km open (27 full)
Stations
5 open (13)
Opened
2023
Footfall
~250k/day
Phase 2 to Marina under construction.
Length
27 km (phase 1)
Stations
8+
Opened
2024
Footfall
~500k/day cap
🚌 Bus rapid transit · BRT · Cowry Card
One of Africa's earliest BRT systems (2008); the Cowry Card links it with the Blue and Red rail lines and LAGFERRY.
Length
Multiple corridors
Stations
—
Opened
opened 2008
Footfall
hundreds of thousands/day
🚆 Metro / commuter · CCECC · CRRC
Both of Lagos's live lines are being pushed to full length by CCECC. Blue Line Phase 2 extends Marina to Okokomaiko to complete the 27 km route; Red Line Phase 2 pushes on to Marina to join it. New CRRC coaches have already cut Blue Line journey times from 18 to 10 minutes.
Length
27 km Blue / 37 km Red
Stations
13 / 12+
Target
2027
Footfall
≈250k–500k / day
Broke ground
2023–24
Est. completion
Q1 2027 · Blue Ph.2
Watch — the phased model has delivered twice already — the real risk here is funding cadence, not capability.
🚆 Metro · CHEC · design-finance-operate
Lagos's most ambitious line yet — Marina to the Lekki Free Zone in a single build rather than phases, under a design-finance-operate deal with China Harbour Engineering. Backed in the 2026 federal budget and part of a $3 bn April 2026 approval covering three national rail projects.
Length
68 km
Stations
≈10
Target
TBC
Footfall
500k→1M / day
Broke ground
preparatory · 2025
Est. completion
Not yet fixed
Watch — critics argue ~10 stations is too few for 68 km, and no firm completion date is set — financed and starting, but not yet a railway.
Whether you’re visiting Lagos for the first time or getting around every day, Met Road makes the city easy to move through. Lagos's Blue and Red Lines are the city's first electric railways — both fully cashless and part of the wider Cowry Card network that also covers BRT and ferries.
The easiest way in from the airport is usually a ride-hailing app (Uber, Bolt or a local equivalent) — fixed prices, no haggling, and ideal with luggage. Licensed airport taxis are also available; always agree the fare before you set off.
Distance-based and cashless. The Blue Line is roughly ₦200–750 per trip; the Red Line roughly ₦500–1,500. A 25% off-peak discount applies between 10:00 and 16:00, and under-5s ride free with a paying adult.
Blue Line runs Monday–Saturday, about 05:30–23:00 (limited Sunday service). Red Line runs Monday–Friday, about 06:00–21:00.
One card does it all: the Cowry Card (₦500–700) works on the Blue Line, Red Line, BRT buses and LAGFERRY. Buy and top up at any rail or BRT terminal.
Marina to Mile 2 on the Blue Line takes 10–15 minutes versus 60–90 by road. Managed by LAMATA; the Phase 2 extensions to Okokomaiko and Marina are targeting 2027.
Fares and times change — always confirm with LAMATA before travelling. Last verified July 2026.
Does Lagos have public rail or rapid transit?
Yes. Lagos has 3 operational systems: Lagos Blue Line, Lagos Red Line and Lagos BRT. A further 2 are under construction or in planning.
How many transit systems does Lagos have?
5 in total — Lagos Blue Line (operational), Lagos Red Line (operational), Lagos Blue & Red — extensions (under construction), Lagos Green Line (in planning) and Lagos BRT (operational).
When will Lagos Blue & Red — extensions open?
It is 2027. Worth noting: the phased model has delivered twice already — the real risk here is funding cadence, not capability.
What is the Lagos Green Line?
Lagos's most ambitious line yet — Marina to the Lekki Free Zone in a single build rather than phases, under a design-finance-operate deal with China Harbour Engineering. Backed in the 2026 federal budget and part of a $3 bn April 2026 approval covering three national rail projects.
How big is Lagos Blue Line?
Lagos Blue Line covers 13 km open (27 full), with 5 open (13) stations, 2023. Technology: Electric · CRRC · CCECC-built.
Who is building Lagos's network?
Lagos Blue Line is built and run with Chinese lead contractors.