metro.ad / Dar es Salaam

🇹🇿 Tanzania

Dar es Salaam

2 transit systems in Dar es Salaam, with service running since 2016 — 1 operational and 1 under construction or planned.

2
systems
21 km
operational
19 km
under construction
since 2016
first line

Systems in Dar es Salaam

Dar es Salaam BRT (DART)

🚌 Bus rapid transit · High-capacity BRT · dedicated lanes

Operational
Mixed lead builder

East Africa's first true BRT and a Sustainable Transport Award winner, running Kimara–Kivukoni; six phases are planned.

Length

20.9 km (Phase 1)

Stations

29

Opened

opened 2016

Footfall

~200k–400k/day

Dar es Salaam BRT — Phase 2

🚌 Bus rapid transit · CNG buses · dedicated lanes

Under construction
Mixed lead builder

The Gerezani–Mbagala corridor; passenger trials began in 2025 using compressed-natural-gas buses.

Length

19.3 km

Stations

Target

trials began 2025

Getting around Dar es Salaam

Whether you’re visiting Dar es Salaam for the first time or getting around every day, Met Road makes the city easy to move through. DART — known locally as Mwendokasi — is East Africa's first true bus rapid transit: dedicated median lanes, level boarding and pre-paid fares that cut a notorious multi-hour crawl to about 45 minutes.

✈️ Arriving in Dar es Salaam

The easiest way in from the airport is usually a ride-hailing app (Uber, Bolt or a local equivalent) — fixed prices, no haggling, and ideal with luggage. Licensed airport taxis are also available; always agree the fare before you set off.

Fares

Very affordable — single trips run roughly TZS 400–800 (about USD 0.18–0.37), a step above the old dala-dala minibuses but far quicker and more reliable.

Operating hours

Buses run around 19–20 hours a day, from roughly 04:30 to midnight, with both express and all-stops patterns on the trunk routes.

Tickets & payment

Tap a Mwendokasi smart card at the turnstile, or buy through the Mwendokasi app. Top up at station booths or with mobile money — M-Pesa, Airtel Money or Tigo-Pesa.

Good to know

Phase 1 runs 20.9 km with 29 stations from Kimara to Kivukoni and Gerezani, carrying 165,000+ riders a day. Operated by UDA-RT under the LATRA regulator, with further phases under construction. It won international sustainable-transport awards in 2017 and 2018.

Fares and times change — always confirm with DART / UDART before travelling. Last verified July 2026.

Frequently asked questions

Does Dar es Salaam have public rail or rapid transit?

Yes. Dar es Salaam has 1 operational system: Dar es Salaam BRT (DART). A further 1 is under construction or in planning.

How many transit systems does Dar es Salaam have?

2 in total — Dar es Salaam BRT (DART) (operational) and Dar es Salaam BRT — Phase 2 (under construction).

When will Dar es Salaam BRT — Phase 2 open?

It is trials began 2025.

How big is Dar es Salaam BRT (DART)?

Dar es Salaam BRT (DART) covers 20.9 km (Phase 1), with 29 stations, opened 2016. Technology: High-capacity BRT · dedicated lanes.